Product Details
Maximum Operating Pressure:
7 and 12 gallon – 600 psi
17 and 33 gallon – 1,000 psi
Sizes:
7 gallon – 600 psi
12 gallon – 600 psi
17 gallon – 1,000 psi
33 gallon – 1,000 psi
Manifold needs to be mounted at lubricator bracket level or lower.
Easy to remove cap
No moving parts
No pumps
No wiring
Venturi style
Infinite flow control with needle valve
Manifold can be removed from tank and mounted remotely
Sight glass
Pressure vessel (A.S.M.E. Code Stamped)
2″ or 3″ manifold
Fill while you drill
Fits any drill rig
Size | Base Diameter | Diameter at Manifold | Height | Weight |
---|---|---|---|---|
7 gallon | 19" | 25" | 31" | 160 lbs. |
12 gallon | 23 1/4" | 29 1/4" | 36 1/2" | 210 lbs. |
17 gallon | 22 3/4" | 27" | 39" | 375 lbs. |
33 gallon | 23 1/8" | 29" | 39 1/2" | 675 lbs. |
Pneumatic Oiler Diagram and Part Description
Item | Quantity | Part Description |
---|---|---|
1 | 1 | Tank Assembly |
2 | 1 | Inlet Valve (3/8" Ball Valve) |
3 | 2 each | 2" and 3" Air Hose Spud |
4 | 1 each | 2" and 3" Air Manifold Assembly |
5 | 1 | Drain Pipe Assembly |
6 | 1 | 1/4" Pipe Plug |
7 | 1 | Discharge Hose Assembly |
8 | 1 | 3/8" Needle Valve Assembly |
9 | 1 | Sight Glass |
10 | 1 | Caution Sticker |
11 | 1 | 3/8" Ball Valve |
12 | 1 | Intake Hose Assembly (20" x 1/2") |
13 | 2 | Bolt and Nut Assembly (3/8" x 1 1/2") |
14 | 1 | Safety Relief Valve Assembly |
15 | 1 | Fill Cap Coupling |
16 | 1 | Discharge Valve (3/8" Ball Valve) |
Operating Instructions
1. Connect air supply to inlet side of manifold, install whipcheck.2. Connect outlet side of manifold to line going to hammer, install whipcheck.
3. Close vent valve #11.
4. Apply air pressure to manifold and open air intake valve #2.
5. Open oil line needle valve #8 four complete turns and lock in place.
6. Open discharge valve #16.
7. Operate hammer and check if bit is wet. A properly lubricated tool will be wet, but not dripping oil.
8. To control lubrication, adjust needle valve counter-clockwise to increase oil, clockwise to decrease. With correct adjustment, lock set screw and continue drilling.
9. To stop oiler, close air intake valve #2 and close discharge valve #16.
Filling Instructions
1. Close inlet valve #2.2. Close discharge valve #16.
3. Open vent valve #11.
4. When air has bled out of tank, remove fill cap #15.
5. Fill lubricator tank with rock drill oil.
6. Replace fill cap #15.
7. Close vent valve #11.
8. Open inlet valve #2.
9. Open discharge valve #16.
Lubricator must be installed upstream of any other injected fluids such as mud, foam, and water!